Conway Piling were contracted in for the piling works for Athlone Boat Club.

Athlone Boat Club was founded in 1835, flood after flood, June 2020 was time to build a New Club House. 

Conway Piling were contracted in for the piling works for Athlone Boat Club.

We were to supply and install 34No 275mm sq. x 275mm sq. precast concrete piles to max depths achieved on site.

With works progressing extremely well, Athlone Boat Club hope to be settled into their new home mid-2021.

Sector

Public - piling works for Athlone Boat Club.

Piles installed

34No precast

Size of piles

275mm sq. precast concrete piles

Installed with

PM20 Junttan Piling Machine