Carrick On Shannon Primary Care Centre

We piled for the substation and for the footpath at the New Primary Care Centre.

Conway Piling were contracted in by Owen Dervin & Sons to supply and install 11No 150mm dia and 11No 220mm dia bottom driven steel tube mini piles to max depths achieved on site.

Pile design was done by own independent pile design company. 

We piled for the substation and for the footpath at the New Primary Care Centre. 

Dynamics and CAPWAY testing were done by our independent pile testing company.

Sector

Commercial - piling contracted in by Owen Dervin & Sons.

Piles installed

22No steel tube Mini Piles.

Size of piles

11No 150mm dia and 11No 220mm dia mini piles.

Installed with

Hanex 2300 mini piler.
© 2023 Conway Piling Limited • Registered with the CRO as Company No. 270776